UPDATED RATE SCHEDULE CHANGES - EFFECTIVE APRIL BILLING 2024

These rate changes will impact members in different ways, depending on their lifestyle and situation. The largest impact to a typical residential account will be in the service availability charge. For example, a typical bill for a residential member with one meter using 1,000 kWh a month would go from $123.94 to 128.76. The service availability charge helps cover fixed costs, such as meters, transformers, and lines necessary to provide electricity to a service regardless of its usage. It is often referred to as a minimum bill.

Rate Schedule 1: Residential 
       
WINTER RATE:(November -May)    
Line Item Existing Rate New Rate  
Service Availability $25.00 $25.00  
0-800 kWh 10.251₵/kWh 10.749₵/kWh  
Excess kWh 8.474₵/kWh 8.886₵/kWh  
       
SUMMER RATE:(June - October)
Line Item Existing Rate New Rate  
Service Availability $25.00 $25.00  
0-800 kWh 10.251₵/kWh 10.251₵/kWh  
Excess kWh 9.450₵/kWh 9.948₵/kWh  
       
Rate Schedule 2: Small Commercial
       
WINTER RATE:(November - May)
Line Item Existing Rate New Rate  
Service Availability -1Ø $25.00 $25.00  
Service Availability -3Ø $42.00 $42.00  
0-1,000 kWh 11.645₵/kWh 12.204₵/kWh  
Excess kWh 9.252₵/kWh 9.709₵/kWh  
       
SUMMER RATE:(June - October)
Line Item Existing Rate New Rate  
Service Availability -1Ø $21.66 $25.00  
Service Availability -3Ø $34.50 $42.00  
0-1,000 kWh 11.645₵/kWh 12.204₵/kWh  
Excess kWh 10.404₵/kWh 10.963₵/kWh  
       
Rate Schedule 3: Large Power
       
WINTER RATE:(November - May)  
Line Item Existing Rate New Rate  
Service Availability $65.00 $65.00  
All kW Demand $8.80/kW $9.35/kW  
1st 100 kWh/kW 6.516₵/kWh 6.765₵/kWh  
Excess kWh 5.016₵/kWh 5.265₵/kWh  
       
SUMMER RATE:(June - October)  
Line Item Existing Rate New Rate  
Service Availability $65.00 $65.00  
All kW Demand $9.92/kW $10.56/kW  
1st 100 kWh/kW 6.516₵/kWh 6.765₵/kWh  
Excess kWh 5.016₵/kWh 5.265₵/kWh  
       
Rate Schedule 6: Irrigation
       
Line Item Existing Rate New Rate  
Service Availability $50.00 $50.00  
All HP $5.30/HP $5.53/HP  
All kWh 7.800₵/kWh 8.049₵/kWh  
       
Rate Schedule 7: Irrigation
       
Line Item Existing Rate New Rate  
Service Availability $50.00 $50.00  
All kWh 17.437₵/kWh 17.909₵/kWh  
       
Rate Schedule 10: Grain Drying or Ginning Service
       
Line Item Existing Rate New Rate  
Service Availability $65.00 $65.00  
Annual HP $33.00/HP $33.12/HP  
All kWh 4.631₵/kWh 4.880₵/kWh  
       

 

 

Needing temporary, tiny home, or a camper service?

All services determined by C&L Electric Cooperatives to fall in the category of temporary or low usage service (such as campers and tiny homes) must complete the following prior to construction of facilities: Payment of 100% of the calculated direct cost will be required to construct the extension of facilities. This amount is a non-refundable Contribution in Aid of Construction. It is also necessary for a member to provide a meter loop that meets C&L Electric Meter on Pole specifications.

Rate Schedule 27: Extension of Facilities

Download Rate Schedule 27